There is an issue about this, basically it's not going to happen because it is editing functionality. They suggest using another solution before import (build a pipeline).
Groundwater reservoirs have a recharge rate. That is the rate that surface, or I suppose even deeper, water is sequestered in the layer in question. We are extracting faster than that recharge rate.
This was an intentional large spend. Typically we have a large surplus every year and the money was just sitting around, growing. This year we decided to do something productive with some of it.
If you want a deployment choose something like openstack-ansible.