The emergency spillway was used because the main one was already badly damaged so they shut it off. Now they're saying the damage to the emergency spillway is even worse than the main spillway so their turning the main spillway on full tilt to drain below the level the emergency spillway activates.
The thing is... They drained below the emergency spill way level many hours ago and it's off, but they're still running the heavily damaged main spillway at full tilt. I think it's a last ditch attempt to drain the lake before the dam fails, they just don't want to say it because everyone will panic
The thing is... They drained below the emergency spill way level many hours ago and it's off, but they're still running the heavily damaged main spillway at full tilt. I think it's a last ditch attempt to drain the lake before the dam fails, they just don't want to say it because everyone will panic