A good 5y is run after all immediate damage has been patched and triaged, and preparation for the 5y is gathering all the evidence needed for the various theories.
5y is expensive to do right. It means that organizations with lots of failure must spend time reflecting and investigating and fixing, rather than shipping new features.
5y is expensive to do right. It means that organizations with lots of failure must spend time reflecting and investigating and fixing, rather than shipping new features.
That is the point!