And more interestingly, the specific reasons various installations were unable to start up as they should have:
> Incidents detected during equipment start-up - Firstly, there is information consistent with the fact that several installations with the obligation of autonomous start-up were finally unable to provide this service in a stable manner, joining the system only once voltage had arrived from outside (from another of the "islands", normally anchored in one of the interconnections). This slowed down the start-up of the "skeleton" of the electricity system that would later make it possible to replenish the supply to demand.