Currently not even the battery capacity is the limiting factor; transmission lines are. The average lead tine to connect your generator to an existing high-voltage transmission line in 12 to 18 months in most of the EU. Building a new line takes years.
Due to that, much of the solar generation can't but be highly local.
I see transmission lines mentioned a lot, but surely keeping the lines we have loaded 100% of the time is part of the equation and batteries can help with that too.
I’d love to know how well loaded the lines are and a cost analysis of batteries at every sensible junction. Things like charging batteries close to solar and discharging them at night and having residential batteries to cope with peak demand.
Due to that, much of the solar generation can't but be highly local.